All projects

PET vs recycled-PET 1 L bottle

Medium riskNeeds reviewBeverage Packaging Ops · Cradle-to-gate · Product pathway
Product system

Study brief

Functional unit
Per 1 L bottle, cradle-to-gate
System boundary
Cradle-to-gate across material supply, manufacturing, and inbound logistics
Methods
TRACI 2.1 · ReCiPe 2016
Comparative
No
Scope revision
1 · Draft
Agent team

Roster

Specialized junior analysts

  • Intake Agent
    Brief structuring
    Structured brief from procurement request
    Done
  • Goal & Scope Agent
    ISO 14044 framing
    Locked functional unit & boundary
    Done
  • Inventory Agent
    LCI modeling
    Flagged transport-leg data gap
    Waiting review
  • Impact Agent
    LCIA characterization
    Mapping TRACI categories
    Working
  • Interpretation Agent
    Hotspots & checks
    Waiting on LCIA results
    Idle
  • Report Agent
    ISO report drafting
    Standing by
    Idle
  • Review Prep Agent
    Critical-review readiness
    Standing by
    Idle
ISO 14040 / 14044 run

Four-phase assessment

Phase 1 of 4

Goal & Scope Definition

AI draft
Phase execution
Rerun against the current approved inputs

Explore impact categories, switch modeled PET scenarios, and queue interpretation actions needed before review or export.

Functional unit
Per 1 L bottle, cradle-to-gate
System boundary
Cradle-to-gate across material supply, manufacturing, and inbound logistics
Impact methods
TRACI 2.1, ReCiPe 2016
Data quality target
Screening-grade model with decision-critical foreground data verified by an analyst

Key decisions

  • Functional unit set to Per 1 L bottle, cradle-to-gate.
  • System boundary recorded as Cradle-to-gate across material supply, manufacturing, and inbound logistics.
  • Allocation rule: Avoid allocation where possible; document physical or economic allocation when required
  • Revision 1 is draft.

Inputs used

Project intakeGoal & Scope revision 1TRACI 2.1ReCiPe 2016
ISO compliance

Checklist

ISO 14040ISO 14044 5.2
  • Intended application and audience stated
  • Functional unit unambiguous
  • Reference flow tied to functional unit
  • Allocation and cut-off rules documented
Review gate
  1. 1AI draftAI draft
  2. 2Analyst
  3. 3Expert
  4. 4Approved
Execution trace

Agent activity

  1. Output contract validated
    Goal & Scope Agent

    3 input bundles linked; 4 ISO checks recorded.

LCAgo — Build smarter. Footprint lighter.