All projects
Engineered flooring — EPD readiness
High riskAI draftNorthwood Surfaces · Cradle-to-grave · EPD readinessProduct system
Study brief
- Functional unit
- Per 1 m2 flooring panel, cradle-to-grave
- System boundary
- Cradle-to-grave across foreground processes and end-of-life assumptions
- Methods
- EN 15804+A2 · CML 2002 · TRACI 2.1 · ReCiPe 2016
- Comparative
- No
- Scope revision
- 1 · Draft
Agent team
Roster
Specialized junior analysts
- DoneIntake AgentBrief structuringStructured brief from procurement request
- DoneGoal & Scope AgentISO 14044 framingLocked functional unit & boundary
- Waiting reviewInventory AgentLCI modelingFlagged transport-leg data gap
- WorkingImpact AgentLCIA characterizationMapping TRACI categories
- IdleInterpretation AgentHotspots & checksWaiting on LCIA results
- IdleReport AgentISO report draftingStanding by
- IdleReview Prep AgentCritical-review readinessStanding by
ISO 14040 / 14044 run
Four-phase assessment
Phase 1 of 4
Goal & Scope Definition
AI draft
Phase execution
Rerun against the current approved inputs
Track the EPD readiness result set, high-risk assumptions, and evidence gates before publication.
Functional unit
Per 1 m2 flooring panel, cradle-to-grave
System boundary
Cradle-to-grave across foreground processes and end-of-life assumptions
Impact methods
EN 15804+A2, CML 2002, TRACI 2.1, ReCiPe 2016
Data quality target
Screening-grade model with decision-critical foreground data verified by an analyst
Key decisions
- Functional unit set to Per 1 m2 flooring panel, cradle-to-grave.
- System boundary recorded as Cradle-to-grave across foreground processes and end-of-life assumptions.
- Allocation rule: Avoid allocation where possible; document physical or economic allocation when required
- Revision 1 is draft.
Open questions
- Expert review: Complete independent expert review before comparative or external-facing use.
Inputs used
Project intakeGoal & Scope revision 1EN 15804+A2CML 2002TRACI 2.1ReCiPe 2016
ISO compliance
Checklist
ISO 14040ISO 14044 5.2
- Intended application and audience stated
- Functional unit unambiguous
- Reference flow tied to functional unit
- Allocation and cut-off rules documented
Gaps
- Complete independent expert review before comparative or external-facing use.
Execution trace
Agent activity
- Output contract validatedGoal & Scope Agent
3 input bundles linked; 4 ISO checks recorded.