All projects

Li-ion cell — supplier comparison

High riskExpert reviewedVoltline Mobility · Cradle-to-gate · Scenario compare
Monte Carlo uncertainty - Supplier B

Supplier B cell confidence and risk distribution

Summarize the modeled interval, assumption quality, and reviewer guidance for per 1 kwh cell capacity, cradle-to-gate before results are used in reports or claims.

Needs review10,000 runs
Median impact
738,000kg CO2e
Pilot lot P50 result
90% interval
52%
563,389-946,190 kg CO2e
Exceedance risk
29%
Above the project review bound
Review gates
1of 4
0 uncertainty actions resolved
Low confidenceReviewer context required

Solvent recovery rate is driving the upper uncertainty tail.

The P5-P95 interval spans 563,389 to 946,190 kg CO2e. Treat comparative language as bounded until supplier process disclosure is attached or explicitly disclosed.

Confidence interval
P5 / P50 / P95
P5 563,389P50 738,000P95 946,190
Distribution

Simulation buckets

Frequency of total GWP outcomes across the Monte Carlo run.

Pilot lot / kg CO2e
7%
563k-627k
18%
627k-691k
31%
691k-755k
24%
755k-819k
14%
819k-882k
6%
882k-946k
Risk distribution

Claim-readiness spread

51%
usable with caveats
  • Within expected range51%
  • Needs reviewer context34%
  • Not claim-ready15%
Contribution context

Hotspots under uncertainty

Supplier B process shares used as uncertainty anchors.

  • Cathode active material273,060 kg
    37%
  • Cell formation electricity177,120 kg
    24%
  • Anode graphite production118,080 kg
    16%
  • Electrolyte and separator88,560 kg
    12%
  • Pack-ready logistics81,180 kg
    11%
Data quality

Uncertainty drivers

Parameters contributing most to interval width.

4 drivers
DriverQuality signalVariance shareReviewer note
Formation electricity factorHigh confidence37%Formation energy has verified bounds and is ready for sourcing scenarios.
Cathode precursor emission factorMedium confidence31%Procurement should preserve route-specific precursor evidence in exports.
Synthetic graphite shareMedium confidence21%Graphite route uncertainty should stay visible in the sourcing packet.
Cell manufacturing yieldHigh confidence10%Yield assumptions are stable for internal sourcing interpretation.